Quality

A documented system,
not a claimed attribute

Our commitment to continual improvement took concrete form when the firm was awarded ISO 9001 management system certification. Traceable procedures, certified competences and systematic verification of results.

ISO 9001

Certified quality management system

UNI 11337

Digital management of information processes

UNI 11558

Property valuation, qualified member

2019

Year the cooperative was founded

Quality policy

Continual improvement as a calling

In a team it is important to share one's weaknesses too: that is what sets continual improvement in motion, which is essential in an organisation working in architecture and engineering.

Client satisfaction and the quality of our services are the foundation of the firm's growth. Process oversight is based on the plan, do, check and review cycle, on performance indicators and on internal audits.

Sustainability is managed through the application of the Minimum Environmental Criteria (CAM) and the DNSH principle, where required by the procurement procedure.

ISO 9001 certification of the quality management system

Quality management system

The improvement cycle

The system is built on the plan, do, check, act (PDCA) cycle, following the structure of clauses 4 to 10 of ISO 9001:2015. Top management sits at the centre: it sets the quality policy and is accountable for it.

Inputs

Needs and context

  • Client requirements
  • Interested parties and their expectations
  • Context of the organisation (§ 4)
  • Statutory and tender requirements
PDCA cycle: planning, operation, performance evaluation and improvement, around leadership P§ 6 D§ 7–8 C§ 9 A§ 10 § 5 Leadership

Outputs

Results

  • Services that meet requirements
  • Client satisfaction
  • Experience gained and reusable
  • Updated objectives for the next cycle
P§ 6

Plan

Analysis of risks and opportunities, measurable objectives, planning of changes.

D§ 7–8

Do

Supporting resources, competence and infrastructure; controlled execution of each commission.

C§ 9

Check

Process indicators, client satisfaction, internal audits and management review.

A§ 10

Act

Handling of nonconformities, corrective actions, continual improvement.

Quality management system

The process map

Every commission passes through a sequence of documented operational processes, backed by management and support processes. Measured results flow back to the start of the chain as experience for future commissions.

Management processes
  • Quality policy
  • Context and interested parties
  • Risks and opportunities
  • Objectives and indicators
  • Management review
Operational processes
of the commission
  1. Proposal and requirements review

    Analysis of the request, feasibility review, preparation of the proposal.

  2. Commission start-up

    Project team, responsibilities, planning and schedule.

  3. Knowledge of the existing building

    Archival research, topographic survey and laser scanning.

  4. Design and information model

    BIM and GIS models, in-house standards, clash detection.

  5. Verification and validation

    Independent check of deliverables before issue.

  6. Construction and close-out

    Works supervision, health and safety coordination, as-built model, handover.

Support processes
Measurement and improvement
  • Internal audits
  • Process indicators
  • Client satisfaction
  • Nonconformities
  • Corrective actions

Information process

How design quality is safeguarded

  1. 01

    Knowledge of the existing building

    Every intervention starts by establishing the existing condition: archival research, topographic survey and laser scanning. The point cloud minimises uncertainty and design errors.

  2. 02

    Information model

    Survey data are fed into BIM and GIS systems to support the design process, with internal BIM Standards and clash detection between disciplines.

  3. 03

    Oversight of execution

    The information process accompanies construction, supporting works supervision and health and safety coordination in the control of time, costs and progress.

  4. 04

    As-built model

    On completion of the work, an information copy of the finished building is produced, on which all maintenance works can be planned.

Federated model of a facility: structures, envelope and service networks coordinated in a single information model
Federated model — the disciplines coexist in a single model and clashes emerge before construction begins.

Quality management system

Checking the deliverable

No deliverable leaves the office without being checked by someone other than its author. If the check finds a defect, the deliverable returns to drafting and goes through the loop again.

Checking loop: drafting, verification, review, issue; if issues are found the deliverable returns to drafting ISSUES → REVISION 1 2 3 4 Drafting Verification Review Issue by a professional other than the author signed by the person in charge Checking loop: drafting, verification, review, issue; if issues are found the deliverable returns to drafting 1 2 3 4 Drafting Verificationby a professionalother than the author ISSUES → REVISION Review Issuesigned by the person in charge
Independent verificationThe checker is never the author: content, calculations and regulatory references are all reviewed.
TraceabilityEvery step leaves a record: revision, date, outcome, person responsible.
Document codingFile naming according to UNI EN ISO 19650 and levels of development according to UNI 11337-4.

Certified competences

The team's qualifications

BIM Manager and CDE Manager

Certified professionals for information coordination and management of the common data environment.

BIM Coordinator and BIM Specialist

In-house, overseeing modelling and discipline coordination.

Construction site safety

Coordinators qualified under Legislative Decree No. 81/2008 for the design and execution phases.

Fire safety design

The Technical Directorate is qualified to work in the field of fire prevention.

Equipment and data security

Our information assets stay under control

Data storage is not left solely to cloud solutions, but entrusted to dedicated, protected and appropriately sized local systems, to ensure security, business continuity and full control over our information assets.

Server room with redundant storage and graphics workstation (illustrative image)

IT infrastructure

Redundant servers, RAID storage connected via optical fibre, redundant backup, centralised management of domain users and secure remote access.

Processing

High-performance graphics workstations, needed to handle the large volumes of information produced by point clouds, digital surveys and BIM models.

Survey equipment

Leica Geosystems laser scanner, total station, GPS antenna and controller, with dedicated point cloud processing software.

Quality management system

The certification path

Every year the system is audited by an independent certification body.

  1. 2019

    Foundation

    The cooperative company is established.

  2. 2022

    First certification

    UNI EN ISO 9001:2015 certificate No. 1128Q is issued.

  3. 2023

    First surveillance

    Annual surveillance audit by the certification body.

  4. 2025

    Renewal

    Certificate renewed for a new three-year cycle.

  5. 2028

    End of cycle

    Valid until 19 October 2028, with annual surveillance audits.

Certificate No. 1128Q issued by Audit Service & Certification S.r.l. — standard UNI EN ISO 9001:2015 — IAF sector 34 — scope: provision of engineered design services. GSVDESIGN Soc. Coop., Via Simone Ghini 32, Rome, Italy.

System documentation is available on request

Request a meeting